This helmet is Mips Rated

Flowline SE Helmet Stealth Black

Flowline SE Helmet Stealth Black

Regular price $119.99 CAD
Regular price $199.99 CAD Sale price $119.99 CAD
Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckl...

Estimated Delivery

Get it by Loading... with standard ground shipping.

Delivery times may vary based on location.

Color
  • Flowline SE Helmet Stealth Black
Size
Email when available

The Trail Rider’s Workhorse

SKU:110437003

Specifications

- 3-Way adjustable screwless visor

- NTA-8776 certified for E-Bike usage

- MIPS B-Series Rotational Impact Brain Protection System

- Full 360-degree fit retention system with 3-way rear height adjustment

- 14 vents for maximum airflow

- Full wrap in-mold construction

- Extended Coverage MTB Trail Helmet

- Fidlock® Magnetic Buckle System

- Dual Density EPS for low and high-speed impacts

- Anti-microbial Quick Dry Premium Liner

- Side strap adjusters

Shipping & Returns

FREE Shipping on all orders over $99. For full details, visit our Shipping & Returns Page.

View full details

Complete the Look

From head to toe, get the full kit to complete your look!

0 items selected Total: $0.00

Overall rating: 5.0 / 5 from 8 reviews.

AI Generated Review Summary

Summary topics

  • (55%%): Many customers loved the fit of the helmet, describing it as perfect, great, and awesome.
  • (13%%): Customers keep praising the color of the product, describing it as spot on, awesome, and top notch.
  • (17%%): Many customers remarked that the product looks great and has a good fit and looks good with glasses.

Review topics: ["fit","looks","helmet"].

Review highlights

  • "Love the fit and looks of all the TLD helmets." — Joe B.
  • "fits good and it looks good with my glasses." — James C.
  • "Color was awesome Safety features top notch Quite light Good piece of safety equipment" — Jason S.

Reviews

Good buy

"Helmet fits great and looks good. 10/10 would reccomene"

— Quinn E. (5/5)

"great"

— Auden (5/5)

"Great helmet"

— Mxracing (5/5)

Great helmet

"Hard to find one that fits. I wear a 7 7/8 hat. This fits perfect and still adjustable. Great quality and comfort"

— Donald P. (5/5)

"Beautiful helmet!"

— Cesar (5/5)

"It’s ight"

— Quintin (5/5)

Super comfortable and looks badass

"Super comfortable and looks badass"

— Aaron F. (5/5)

I love TLD helmets. I

"I love TLD helmets. I have the A1, A2, Stage and now the Flowline SE. I was looking for a new e-bike certified helmet so this was an obvious choice. I tried a few others (POC Kortal, Specialized Tactic) but nothing fits like a TLD helmet! After my first ride in the Flowline I realized I didn't think about my helmet once - no adjustments, nothing. I just rode my bike. I suppose the ventilation could be a little better, but seeing as I got this for my e-bike adventures that's kind of a moot point since I'm always moving and this thing breathes quite well as long as you're going at a decent speed."

— Sean A. (5/5)

Q&A