sale
This helmet is Mips Rated

Flowline SE Helmet Radian Flo Yellow

Flowline SE Helmet Radian Flo Yellow

Regular price $119.99 CAD
Regular price $199.99 CAD Sale price $119.99 CAD
No returns on sale items. Exchange for store credit only.
Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckl...

Estimated Delivery

Get it by Loading... with standard ground shipping.

Delivery times may vary based on location.

Color
  • Flowline SE Helmet Radian Flo Yellow
  • Flowline SE Helmet Radian Orange / Dark Gray
Size
Email when available

The Trail Rider’s Workhorse

SKU:110933053

Specifications

- 3-Way adjustable screwless visor

- NTA-8776 certified for E-Bike usage

- MIPS B-Series Rotational Impact Brain Protection System

- Full 360-degree fit retention system with 3-way rear height adjustment

- 14 vents for maximum airflow

- Full wrap in-mold construction

- Extended Coverage MTB Trail Helmet

- Fidlock® Magnetic Buckle System

- Dual Density EPS for low and high-speed impacts

- Anti-microbial Quick Dry Premium Liner

- Side strap adjusters

Shipping & Returns

FREE Shipping on all orders over $99. For full details, visit our Shipping & Returns Page.

View full details

Overall rating: 5.0 / 5 from 5 reviews.

AI Generated Review Summary

Summary topics

  • (13%%): It was highlighted by customers that the color of the product was awesome and top-notch.
  • (55%%): A substantial number of customers raved about the fit, mentioning that it was perfect and comfortable.
  • (17%%): Many customers expressed satisfaction with the looks of the product, stating that it looks great and amazing.

Review topics: ["straps","fit","helmet"].

Review highlights

  • "Love the fit and looks of all the TLD helmets." — Joe B.
  • "fits good and it looks good with my glasses." — James C.
  • "Color was awesome Safety features top notch Quite light Good piece of safety equipment" — Jason S.

Reviews

Great helmet! Got for our toddler…

"Hi Vis, no pinch chin strap. Great coverage. This was to replace his first ever helmet and has been a really solid helmet. I think I’ll replace my own Smith Forefront 2 with one!"

— Anthony E. (5/5)

Best helmet for big head

"The helmet was perfect fit, lots of ventilation so you will enjoy riding bicycle since the helmet also lightweight too."

— Ary J. (5/5)

It’s a great helmet

"I like that the strap is very adjustable and it’s easy to unclip the strap because the magnets and the visor is very adjustable as well and it’s comfortable and the air flow is phenomenal"

— Brandon M. (5/5)

Awesome product

"I have tried every brand there 8s. As a dealer and consumer. TLD is just IT!!"

— Hamilton O. (5/5)

Great Bike Helmet

"Highly recommend. Would purchase again. Great value, good looking fit well. Jim Colorado Springs, CO"

— Jim C. (5/5)

Q&A