Skip to product information
sale Victoria Day
This helmet is Mips Rated

Flowline SE Helmet Radian Camo Gray / Army Green

Flowline SE Helmet Radian Camo Gray / Army Green

Regular price $119.99
Regular price $199.99 Sale price $119.99
+ LOYALTY MEMBERS receive 599 Points

Victoria Day

Spend $200+ on products with the Victoria Day badge and get a $40 eGift Card emailed to you for FREE!

No returns on sale items. Exchange for store credit only.
Color
  • Flowline SE Helmet Radian Camo Black / Gray
  • Flowline SE Helmet Radian Camo Gray / Army Green
Size

Sold Out

Email when available

The Trail Rider’s Workhorse

MIPS-equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock magnetic buckle system, Flowline SE is the workhorse of trail helmets.

SKU:110063001

Specifications

- 3-Way adjustable screwless visor

- NTA-8776 certified for E-Bike usage

- MIPS B-Series Rotational Impact Brain Protection System

- Full 360-degree fit retention system with 3-way rear height adjustment

- 14 vents for maximum airflow

- Full wrap in-mold construction

- Extended Coverage MTB Trail Helmet

- Fidlock® Magnetic Buckle System

- Dual Density EPS for low and high-speed impacts

- Anti-microbial Quick Dry Premium Liner

- Side strap adjusters

- 5-Star Virginia Tech safety rating

Shipping & Returns

FREE Shipping on all orders over $79. For full details, visit our Shipping & Returns Page.

View full details

Hand Painted Title

Custom Lettering -

Hand Painted Lifestyle

Name here is shown digitally as an example. Your hand lettered helmet will be custom and look much cooler.

Hand Painted Signature

Hand Painted Title

Custom Lettering -

Font:
Color: Colors by: 1 Shot
If you want customized paint options such as race #, gold leaf, etc, please contact our paint department at paint@troyleedesigns.com

Please review your order carefully.

  • Text

  • Font

    Block

    Script

  • Color

Unfortunately we can't offer refunds on customer spelling errors. Please allow an additional 7-10 business days for your custom lettering to be processed. Please note, obscene and offensive language is not allowed.

If you want customized paint options such as race #, gold leaf, etc, please contact our paint department at paint@troyleedesigns.com

Name here is shown digitally as an example. Your hand lettered helmet will be custom and look much cooler.

Hand Painted Signature