SKU: # 108959001

Flowline Helmet W/MIPS Orbit Black

$149.99
+ LOYALTY MEMBERS receive 749 Points

New
MIPS
SKU: # 108959001

Flowline Helmet W/MIPS Orbit Black

$149.99
+ LOYALTY MEMBERS receive 749 Points

  • Flowline Helmet W/MIPS Orbit Apple
  • Flowline Helmet W/MIPS Orbit Black
  • Flowline Helmet W/MIPS Orbit Cinnamon
  • Flowline Helmet W/MIPS Orbit Dk Blue
  • Flowline Helmet W/MIPS Orbit Forest Green
  • Flowline Helmet W/MIPS Orbit Gold / Black
  • Flowline Helmet W/MIPS Orbit Gray
  • Flowline Helmet W/MIPS Orbit Magenta / Black
  • Flowline Helmet W/MIPS Orbit Mirage Blue
  • Flowline Helmet W/MIPS Orbit Oasis Blue / Black
  • Flowline Helmet W/MIPS Orbit White
  • XS/SM
  • MD/LG
  • XL/2X

Pre-Order: Ships on

Qty
Sold Out

Details

The all-new Flowline Helmet is hand picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, cool and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
Features
Strap Adjustment
Side strap adjusters 
Features
E-Bike
NTA-8776 certified for E-Bike usage
Features
MIPS
MIPS B-Series Rotational Impact Brain Protection System
Features
Retention System
Full 360-degree fit retention system with 3-way rear height adjustment 
Features
Safety
5-Star Virginia Tech safety rating
Features
Ventilation
14 vents for maximum airflow 
Features
Visor
3-Way adjustable screwless visor
how to fit helmets section
How to Fit
Measure Your Head
With a fabric tape measure around the circumference of your head holding the tape just above your eyebrows and ears. 1” = 25mm

Specifications

Specifications

Specification Image

Specifications

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment 
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters 
  • 5-Star Virginia Tech safety rating

Follow us on Instagram

Reviews

Flowline Helmet W/MIPS Orbit Black
Flowline Helmet W/MIPS Orbit Black
Flowline Helmet W/MIPS Orbit Black
Flowline Helmet W/MIPS Orbit Black
Flowline Helmet W/MIPS Orbit Black